Skip to content
Monday – Friday: 7 a.m. – 5 p.m.(206) 555-0104

Post-construction cleaning in Seattle

Dust gone. Glass clear. Ready for the reveal.

We are a crew of about 20 that does the last clean on remodels and new builds for designers, architects and remodelers: the dust, every pane and fixture, then a set of photos of each room for your handover file.

  • A written scope before the day
  • Photos of every room, same day
  • Seattle and nearby
A bright empty room with hardwood floors, two windows and a ceiling fan, light lying across the clean boards

Reveal day

From the punch list to the first photograph

The order we run on every reveal-day clean. Your designer sets the date, and we work back from it.

  • Two days before: walk the punch list

    Xiuying or Kosal walks each room with your punch list, marks what is still trade work and what is ours, and photographs the starting condition. The written scope follows the same day.

  • The day before: dust, top down

    Ceilings, vents, light fittings, sills and shelves first, then the floors: vacuumed, then damp-mopped. Tape, film and stickers come off as we go.

  • Reveal morning: glass and fixtures

    Every pane and mirror, the shower glass and the tracks. Faucets, handles and light fittings are wiped by hand with soft cloths, so a finish is never scratched.

  • The last hour: the walk-in

    One more look from the door of each room, with the light your client will see it in. Anything you have staged stays exactly where it is.

  • Same day: the photo set

    A set of photos of every room, wide and close, goes to the person who booked us for your handover file. They are record photos, not a photographer's shoot.

The finish

What a finished room looks like when we leave

Glass, tile and floors, photographed in daylight before anything is moved back in.

Showing 8 of 8

Glass shower enclosure in a new bathroom with an empty bedroom beyond
Shower glass, edge to edge
Bathroom with a granite vanity and a glass shower enclosure
Vanity, mirror and enclosure
Bathroom with a freestanding tub and a glass-walled shower
Tub, tile and glass wall
Empty room with tall dark-framed glass doors and a grey floor
Steel-framed glass doors
Empty renovated kitchen with white cabinets, granite counters and vinyl plank floors
Counters wiped, floors clear
Contemporary kitchen with white cabinets, marble counters and a stainless range hood
Marble and steel, no film left
Empty entry and living room with hardwood floors and a coffered ceiling
Entry, floors and ceiling
Empty room with a curved bay of tall windows and sunlight on the floor
A bay of windows

Sample photos.

Where our list stops

What is ours on reveal day, and what stays with your trades

A clean finishes a room. It does not repair one.

What is ours on reveal day, and what stays with your trades
Your tradesWe clean
GlassYour tradesReplacing scratched or etched glassWe cleanPanes, mirrors and shower glass, stickers off, streaks gone
FixturesYour tradesAdjusting, re-finishing or re-hanging themWe cleanFaucets, handles and light fittings wiped by hand
TileYour tradesRe-grouting, caulking and sealingWe cleanDust and haze wiped from tile and grout lines
PaintYour tradesTouch-up paintingWe cleanDust and drips wiped from trim and sills
FloorsYour tradesSanding, refinishing and scratch repairWe cleanVacuumed, damp-mopped, protective film off
StylingYour tradesStaging and installsWe cleanNothing placed is moved

Pricing

A walkthrough first, then one written number

There is no price list, because a hallway bath and a whole-house build are different days. We walk the project, then send a written number for the scope we listed, split by visit if there is a rough clean first.

What moves the number

  • Square footage and floors

  • Panes, glass doors and shower enclosures

  • What the trades left behind

  • Access, stairs and parking

Kitchen with a skylight, a center island and stainless steel appliances

From the file

What a designer's email looks like after a reveal day

“The glass in the primary bath was streak-free at 8 a.m., and the photos were in my inbox before the client walked in. I sent two of them to the stone fabricator that afternoon.”

Leah DoyleInterior designer, Capitol Hill

“They read the punch list the way I wrote it. The tile setter still had a day left upstairs, and Xiuying told me which rooms to hold back instead of cleaning around him.”

Navid ElgendyArchitect, Montlake addition

“I book the rough clean before the drywall finish and the reveal-day clean after paint. The invoice names the rooms, so my client can match it to the scope.”

Tad EastmanRemodeling contractor, West Seattle

Sample reviews.

The leads

Who walks your rooms

Four people you will meet or hear from before a reveal day. The rest of the crew works under them.

  • Xiuying Szeto

    Owner, walkthrough lead

    Writes every scope and walks the punch list with the designer, before and after the clean.

  • Kosal Prak

    Glass and fixtures lead

    Leads the glass pass on reveal morning: panes, mirrors, shower enclosures and hardware.

  • Anabel Mares

    Dust control and floors lead

    Runs the rough clean and the floors, and decides when a room is dry enough to photograph.

  • Deja Lockhart

    Project coordinator

    Books reveal days against your install schedule and sends the photo set the same day.

Where we clean

Seattle, neighborhood by neighborhood

Most projects are in the city, with a short list of cities beside it.

Seattle neighborhoods

  • Capitol Hill
  • Fremont
  • Madison Park
  • Magnolia
  • Montlake
  • West Seattle
  • Beacon Hill
  • Columbia City
  • Madrona
  • Eastlake
  • Leschi

Nearby, King County

  • Newcastle
  • Hunts Point
  • Yarrow Point
  • Kent
  • Des Moines

Nearby, Snohomish County

  • Brier
  • Woodway

We don't take projects in Tacoma or Everett, on the Kitsap Peninsula or across the mountains. The islands need a ferry day, so ask first.

Before you send the list

Short answers

Do I need to be there on reveal day?

No. Your site lead or designer can let us in, or a lockbox holds the key. Codes and alarms are kept on our schedule only until the job is done. The policies page has the details.

What if something is missed?

Tell us within two business days of the reveal and we come back to finish it. The policies page says what that covers.

Do you clean up construction debris?

We bag small debris and the dust the trades left. Bulk debris, packaging and materials go to your contractor's dumpster before we start.

Is it only for designers?

No. Architects, remodelers and homeowners booking their own final clean send the same punch list, and get the same scope.

How far ahead should I book?

Send the reveal date with the punch list. We work back from it, and the project coordinator confirms the day in writing.

Start here

Send the punch list

Tell us the project and the reveal date. We reply by the end of the next business day with a time for the walkthrough.

Hours
Monday – FridayToday
7 a.m. – 5 p.m.
SaturdayToday
By arrangement, for reveal days
SundayToday
Closed

The project

The clean

What is it?

Texts about this request only. Call us if the reveal is within the week.